Fizzie, I thought being booked in for 9am, I would be near first cab off the rank .
Usually has been good when I have my colonoscopy.
Kick off at 9am, home by lunch time.
I know A Knee replacement is a lot different, so I'm figuring someone needed attention greater then me.
I look forward to preparing for the 9th of July.
Anyway, with the help of two contractors we got a kitchen removed, new one half installed.
Just waiting for the sparky & plumber to rough in.
Then the test of the cabinets can be installed, the Splash back tiled, Trims installed.
Should be out of there Friday Lunch time.
I'm fortunate to have good mates who I trust.

You don't use magic to disappear, ya use a 4x4 & Swag.