Author Topic: Pacific Highway Bypass of Coffs Harbour  (Read 49762 times)

0 Members and 1 Guest are viewing this topic.

Offline gronk

  • KKK... Kwik Kool Kamping
  • Hard Top Camper User
  • ******
  • Posts: 7996
  • Thanked: 401 times
  • Gender: Male
Re: Pacific Highway Bypass of Coffs Harbour
« Reply #275 on: July 28, 2021, 10:37:12 PM »
Not due to be finished until 2028….that’s if it gets started.
2009 200 series Yota
2019 Lifestyle Ultra

Offline alnjan

  • Hard Top Camper User
  • ******
  • Posts: 2922
  • Thanked: 221 times
  • Gender: Male
Re: Pacific Highway Bypass of Coffs Harbour
« Reply #276 on: July 28, 2021, 10:52:12 PM »
Yep, Coffs is already about 12 months behind.  A lot of small works being done in preparations for the big work.   
 
Cheers

Al and/or Jan

Offline Fizzie

  • Hard Top Camper User
  • ******
  • Posts: 4782
  • Thanked: 694 times
  • Gender: Male
Re: Pacific Highway Bypass of Coffs Harbour
« Reply #277 on: July 29, 2021, 07:26:20 AM »
Announced yesterday ...

So how many frogs, animals, birds, flowers, trees & sacred sites have been found in it's path so far ??? ::)
Winner PotM comp Jan 2021!

Terrie: 2014 Ford SZ Territory,
Coromal: 2023 Soul Seeker 18'
Sunnie:  2010 Sunliner Holiday

Offline Bird

  • Once Was Lost, now am found
  • Hard Top Camper User
  • ******
  • Posts: I am a geek!!
  • Thanked: 1818 times
  • Gender: Male
  • Life is far too long....
    • My Place.
Re: Pacific Highway Bypass of Coffs Harbour
« Reply #278 on: July 29, 2021, 10:56:03 AM »
Quote from: gronk
Not due to be finished until 2028….that’s if it gets started.
it should be good for a politicians promise for a good 5 more elections I reckon...
-
Click to enlarge

Gone to a new home

Offline gronk

  • KKK... Kwik Kool Kamping
  • Hard Top Camper User
  • ******
  • Posts: 7996
  • Thanked: 401 times
  • Gender: Male
Re: Pacific Highway Bypass of Coffs Harbour
« Reply #279 on: July 29, 2021, 05:47:28 PM »
it should be good for a politicians promise for a good 5 more elections I reckon...

And instead of building it 5yrs ago the cost will have doubled by the time it’s finished.  So approx 2 billion and counting.
2009 200 series Yota
2019 Lifestyle Ultra

Offline Bird

  • Once Was Lost, now am found
  • Hard Top Camper User
  • ******
  • Posts: I am a geek!!
  • Thanked: 1818 times
  • Gender: Male
  • Life is far too long....
    • My Place.
Re: Pacific Highway Bypass of Coffs Harbour
« Reply #280 on: July 29, 2021, 07:00:12 PM »
And instead of building it 5yrs ago the cost will have doubled by the time it’s finished.  So approx 2 billion and counting.
2 billion blow out you mean...
-
Click to enlarge

Gone to a new home

Offline alnjan

  • Hard Top Camper User
  • ******
  • Posts: 2922
  • Thanked: 221 times
  • Gender: Male
Re: Pacific Highway Bypass of Coffs Harbour
« Reply #281 on: June 20, 2022, 11:15:43 AM »
We have reached the next stage.  Tenders have been announced.

"Coffs Harbour Major Contractor Announced
We are pleased to announce that the successful tender of the major contract is Ferrovial Gamuda Joint Venture. Major construction will start next year with the bypass being delivered using a single design and construct contract to ensure innovation, efficiency and value for money in the delivery of the project. The project includes the three tunnels at the major ridgelines, as per the environmental planning approval.

The Australian and NSW Governments have committed $2.2 billion to build this 14 kilometre bypass, which is one of the biggest ever projects in the Coffs Harbour region. During construction, it is estimated that the project will create about 600 direct jobs. For the past 18 months we’ve been carrying out important early work for the bypass, including at-house noise treatments, relocating essential utilities, structural removals and environmental work so major construction can hit the ground running. Major work is expected to start about March, weather permitting, with site establishment including construction. The bypass is expected to be open to traffic from late 2026, with construction complete in late 2027."


https://pacifichighway.nsw.gov.au/coffsharbourbypass
Cheers

Al and/or Jan

Offline Bird

  • Once Was Lost, now am found
  • Hard Top Camper User
  • ******
  • Posts: I am a geek!!
  • Thanked: 1818 times
  • Gender: Male
  • Life is far too long....
    • My Place.
Re: Pacific Highway Bypass of Coffs Harbour
« Reply #282 on: June 20, 2022, 01:58:34 PM »
Quote from: alnjan
The bypass is expected to be open to traffic from late 2026, with construction complete in late 2027."[/i]
have you contacted Centrebet for the odds?
-
Click to enlarge

Gone to a new home

Offline gronk

  • KKK... Kwik Kool Kamping
  • Hard Top Camper User
  • ******
  • Posts: 7996
  • Thanked: 401 times
  • Gender: Male
Re: Pacific Highway Bypass of Coffs Harbour
« Reply #283 on: June 20, 2022, 06:29:58 PM »
A joint venture between Spanish and Malaysian companies !!
What happened to the Aussie companies that have built most of the M1 from Sydney to Queensland ??
2009 200 series Yota
2019 Lifestyle Ultra